Home > News

Best-selling Rapid Clamp for Construction Formwork

May. 16, 2025

The Rapid Clamp system is a high-strength concrete forming system designed for fast-paced gangform operations. It has the strength required for the large contact areas and fast pour rates common in large gangform applications.

Best-selling Rapid Clamp for Construction Formwork

Item

Rapid Clamp for Construction Formwork

Rapid Clamp Tensioner

Rapid Clamp Tensioner

Photo

Steel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid ClampSteel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid Clamp


Steel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid ClampSteel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid Clamp


Steel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid Clamp


Steel Pressed Formwork Clamp Spring Clamp Wedge Clamp Rapid Clamp


Material

Carbon steel 

Carbon steel 

Carbon steel

Carbon steel

Carbon steel 

Size

70*105mm*3mm,

75*110mm*3.75mm,

etc.

70*105mm*3mm,

75*110mm*3.75mm,

etc.

75*105mm*3mm

/

/

Weight

310g, 420g,etc.

310g, 420g,etc.

380g/pc

2.9kg/pc

3.2kg/pc

Finishing

Glavanizing

Painted, Powder Coated

Galvanizing

Galvanizing

Galvanizing,

Powder Coated

Packing

50pcs/bag or box;

then put in ton bag 

           or on pallet 

50pcs/bag or box;

then put in ton bag

or on pallet

50pcs/bag or box;

then put in ton bag

or on pallet

4pcs/box

4pcs/box

Size

 For 6-10mm Tie Rod.